Industrial facility

EMISSIONS COMPLIANCE SYSTEMS

Engineered for Methane Compliance

Uptime. Audit-ready reporting. Hardware included. We deliver a complete emissions management solution—not just equipment. VRUs, flares, combustors, and gas lift compressors engineered for performance. Serving North America and international markets.

14+

Years Experience

85%

Built In-House

24-Hour

Support Response

Global Reach

North AmericaAsia-PacificAfricaInternational

Why RAW Combustion

Built Different. Built Better.

Over 20 years of industry experience. 85% of compressor components manufactured in-house. Engineered for performance, reliability, and long service life.

25-40% More Efficient

Our patented SKY airend technology delivers superior gas flow at the same horsepower—or the same flow with significantly less energy.

Extended Equipment Life

4 bearings on the discharge end means 300% longer bearing life. Our units outlast competitors by 2-3 years.

Custom Engineering

Every unit is engineered to your exact specifications. Standard layouts modified per customer need with 3-4 week lead times.

24-Hour Support

Direct access to our engineering team. Stock of essential parts. Rapid service response anywhere in the field.

Industry Compliance

EPA OOOO, ASME Section VIII, B31.3, NACE MR0175, API 520/521/582, Class 1 Div 2 certified. Full documentation provided.

Flexible Options

Purchase or rent. 12-month warranty. Comprehensive maintenance plans. We're a partner, not just a vendor.

VRU rental unit in transit

Emissions Equipment Rentals

Need Emissions Equipment Fast?

Our rental fleet includes VRUs from 15 HP to 300 HP, combustors, and flares—fully packaged and ready for immediate deployment. Flexible 12–24 month terms with maintenance and field support included.

  • VRUs 15HP to 300HP available
  • Combustors and flares in stock
  • Maintenance included in rental
  • M-LINK remote monitoring available
  • Rapid deployment anywhere in the field

Ready to Optimize Your Operations?

Get a custom quote for VRUs, flares, combustors, or rental equipment. Our engineering team responds within 24 hours.